Dangerous Goods Shipment Checklist Template

Dangerous goods travel safely when every step is done by a trained person and checked before the carrier collects. Classify the goods, choose authorised packaging, mark, label and document them, and release the consignment only when the whole file is right.

Last reviewed: November 2026

Printed from checkflow.io/templates/transport-logistics/dangerous-goods-shipment-checklist

This free dangerous goods shipment checklist is for the shipper’s trained dangerous goods person, with the warehouse team who pack and load and the person who books the carrier. One run covers one outbound consignment, planned back from the collection date. It checks the training records of everyone who will handle or sign, then classifies the goods (UN number, proper shipping name, class and packing group), checks whether they are forbidden or can go as a limited or excepted quantity, packs them in authorised packaging, marks and labels the packages, prepares the transport document or shipper’s declaration and the emergency information, and confirms the carrier accepts them. A release approver checks the whole file before collection. Road under ADR or 49 CFR and air under the ICAO Technical Instructions each add their own tasks. Only trained people may classify, pack, mark and sign: this template organises the work around the regulations and does not replace them.

One Consignment, from Classification to Collection

This checklist runs one consignment of dangerous goods that your business sends out by road or air. It starts with the training records of the people who will do the work, then classifies the goods, applies the rules for the mode, packs, marks and labels the packages, prepares the document, gets the carrier’s acceptance and the release approval, and keeps the records after collection.

The driver’s side, the hazardous materials endorsement and hazmat training of a new driver, is in Phase 6 of the Commercial Driver Onboarding Checklist. For the order itself use the Order Fulfillment Checklist, and for a brand moving its stock to a warehouse provider the 3PL Onboarding Checklist. Goods coming in from abroad belong in the Import & Customs Compliance Checklist, and following a consignment after it leaves in the Shipment Tracking Workflow Checklist. Storing and using hazardous substances at your own site is covered by the COSHH Assessment Checklist.

This checklist

One consignment

Covers: training records, classification, forbidden, limited and excepted quantity status, the mode’s rules, packaging, marks and labels, the document and emergency information, carrier acceptance, release, loading and records.

Planned around: the collection date booked with the carrier.

Output: a consignment released on a checked file, with the record kept.

The driver

Commercial driver onboarding

Covers: one new US truck driver’s qualification file, with a phase for the hazardous materials endorsement and hazmat training.

Planned around: the driver’s start date.

Output: a driver cleared to haul. Use this checklist for each consignment they carry.

Substances at work

COSHH assessment

Covers: the risks of hazardous substances stored and used at your own site in Great Britain.

Planned around: the assessment’s review date.

Output: controls for the workplace. This checklist covers the goods once they are sent out.

What the Dangerous Goods Shipment Checklist Covers

Nine phases take one consignment from the training check to the filed records. The first task records the collection date, which sets every due date, the mode of transport and the four people. The mode adds its own tasks: the adviser, small load check, driver and orange plate checks for road under ADR; the PHMSA registration check, shipping paper and placards for road in the US; and the aircraft limits, variations, labels and shipper’s declaration for air. A limited or excepted quantity swaps in its own packing and marking tasks. The release in Phase 7 is assigned to the release approver alone, and nothing after it can be completed until it is given.

  1. Phase 1

    Phase 1: Set Up & Check Training

    3 tasks

    Start a run as soon as an order will send dangerous goods out. The first task records the consignment, the collection date that sets every due date, the mode of transport and the four people. Before anyone classifies, packs or signs, their training record is checked: only trained people may do this work.

    • Record the consignment, the mode and the people — what is being sent and to whom, the collection date booked with the carrier, the mode of transport, the carrier and route, and the four people this checklist assigns
    • Check the training records of everyone who will handle or sign — each person who will classify, pack, mark, label, load or sign has a current training record for that job; anyone not yet trained works only under the direct supervision of a trained person, and nobody untrained signs
    • Get the safety data sheet and product details — the current safety data sheet for each product with its transport information, the formulation or flash point where it decides the class or packing group, and the quantities and pack sizes ordered
  2. Phase 2

    Phase 2: Identify & Classify the Goods

    5 tasks

    The consignor is responsible for classifying the goods. A trained person identifies every hazard, finds the right entry in the dangerous goods list and records the UN number, proper shipping name, class and packing group. Everything after this depends on getting it right.

    • Identify every hazard of the goods — the hazards of each product and mixture, which hazard comes first, and whether the goods meet the criteria of any class at all; goods that are not dangerous for transport do not need this run
    • Assign the UN number and proper shipping name — the most specific entry in the dangerous goods list that fits the goods, its UN number and proper shipping name, and any technical name the entry needs in brackets
    • Record the class, any subsidiary hazard and the packing group — the hazard class or division, any subsidiary hazard, and the packing group (I, II or III) from the list or from the goods’ properties, such as a flammable liquid’s flash point
    • Check whether the goods are environmentally hazardous — whether the goods meet the criteria for an environmentally hazardous substance, which adds a mark to the packages under ADR, and anything your mode’s rules add for it
    • Record who classified the goods and how — the trained person who classified the goods, the sources used (the dangerous goods list, the safety data sheet, any test data) and the date, kept with the consignment file
  3. Phase 3

    Phase 3: Check the Mode’s Rules & Limits

    8 tasks

    The same goods can be allowed by road and forbidden by air, or allowed only in smaller packages. Check the edition of the rules in force on the collection date, whether the goods are forbidden, and whether a limited or excepted quantity applies. The tasks for the mode chosen on the first task appear here.

    • Confirm the rules and the edition that apply on the collection date — the rules for the mode chosen on the first task, the edition in force when the goods travel, and any national rules for the countries on the route
    • Check whether the goods are forbidden, or go as a limited or excepted quantity — whether the goods may travel by this mode at all, and whether the inner packaging and package sizes let them go as a limited quantity or an excepted quantity, which changes the packaging and marks
    • Stop the shipment, or change the mode — after ‘Forbidden by this mode’ only: the goods do not go by this mode; change the mode on the first task and check again, or record that the shipment is cancelled and archive the checklist
    • Confirm your dangerous goods safety adviser’s advice — Road under ADR: your dangerous goods safety adviser (DGSA), or the exemption you rely on, and the adviser’s advice on this consignment recorded
    • Check whether you must register with PHMSA — US road: whether this shipment is one that 49 CFR 107.601 lists, such as any quantity that needs placards, so that your registration with PHMSA is current before you offer it
    • Check the limits for passenger and cargo aircraft — Air: whether the goods may go on passenger aircraft or only on cargo aircraft, and the most each package may hold for each, from the ICAO Technical Instructions or, in the US, columns 9A and 9B of the 49 CFR 172.101 table
    • Work out whether the load is under the ADR small load threshold — Road under ADR: the transport category of each entry and the total quantity on the vehicle, worked out by the rule in ADR 1.1.3.6; under the threshold, requirements such as orange plates and instructions in writing do not apply
    • Check the State and operator variations — Air: the variations that the countries on the route and the airline file against the international rules, which can forbid goods or add conditions; ask your forwarder or airline which apply
  4. Phase 4

    Phase 4: Choose the Packaging & Pack

    6 tasks

    Dangerous goods go in packaging authorised for them, usually of a UN-certified design type, closed as the maker’s instructions say. A limited or excepted quantity has its own packing task, which replaces the UN packaging tasks when the answer in Phase 3 says so.

    • Choose packaging authorised for the goods and the mode — a packaging type the packing instruction allows for this entry and mode, with a UN mark showing a design type certified for the goods’ packing group
    • Get the packaging certificate and closure instructions — the certificate or data sheet for the design type, the maker’s closure instructions and any test report the supplier sends, kept on file
    • Pack as a limited quantity — after ‘Limited quantity’ only: inner packagings no larger than the limit for the entry, in good-quality outer packaging within the gross mass limit (under ADR, 30 kg for a box and 20 kg for a shrink-wrapped tray)
    • Pack as an excepted quantity — after ‘Excepted quantity’ only: inner and outer packagings within the limits of the entry’s excepted quantity code, in packaging that meets the tests the rules set for excepted quantities
    • Pack and close each package — the goods packed as the packing instruction and the maker’s closure instructions say, with any absorbent or cushioning they require, and each package listed with its contents and mass
    • Check each package for damage, leaks and residue — no damage, leaks or residue on the outside, closures tight and nothing loose; a damaged package is repacked before it goes any further
  5. Phase 5

    Phase 5: Mark & Label the Packages

    6 tasks

    Each package shows what is inside and its hazards, so anyone who handles it can see them. Marks and labels go on once the packages are closed and checked.

    • Mark each package with the UN number and proper shipping name — the UN number and proper shipping name on each package, in the size the rules set, with any other marks the mode needs, such as the consignor’s or consignee’s name and address
    • Apply the hazard labels — the label for the class and for each subsidiary hazard the entry shows, on every package that needs one
    • Apply the limited quantity mark — after ‘Limited quantity’ only: the limited quantity mark on each package, in its air version if any part of the journey is by air, at least 100 mm square unless the package is too small
    • Apply the excepted quantity mark — after ‘Excepted quantity’ only: the excepted quantity mark with the label number of the goods and, where it is not shown elsewhere on the package, the consignor’s or consignee’s name
    • Add the other marks the goods need — the environmentally hazardous substance mark where Phase 2 found one, orientation arrows where the rules require them, and the marks for any overpack
    • Apply the air handling labels — Air: the Cargo Aircraft Only label where the goods are not allowed on passenger aircraft, and any handling label the rules or the airline require
  6. Phase 6

    Phase 6: Prepare the Document & Emergency Information

    6 tasks

    The consignor gives the carrier a document describing the dangerous goods and the emergency information that goes with them. A trained person checks the document against the packages and signs where the mode needs a signature. The document task for the mode chosen on the first task appears here.

    • Prepare the ADR transport document — Road under ADR: the UN number, proper shipping name, class, packing group, number and description of packages, total quantity of each entry, consignor and consignee, and the tunnel code unless it is known that the journey passes through no tunnel it applies to
    • Prepare the hazardous materials shipping paper — US road: the identification number, proper shipping name, class (with any subsidiary class) and packing group, the total quantity with its unit, entered first or marked in an HM column, and the emergency response telephone number
    • Prepare the shipper’s declaration for dangerous goods — Air: the declaration in the form the airline accepts, with the net quantity per package; in the US, two copies, and the certification includes the statement that all the applicable air transport requirements have been met
    • Provide the emergency response information — information on the immediate hazards, fire, spills and first aid that goes with the document, and for US shipments a telephone number monitored at all times by someone who knows the goods
    • Check the document against the packages — every entry, quantity and package count on the document matches the packages, marks and labels, and the consignee, route and carrier are right
    • Sign the declaration or certification — a trained person signs the shipper’s certification or declaration where the mode needs one, and nobody signs for goods they have not checked or work they are not trained for
  7. Phase 7

    Phase 7: Carrier Acceptance & Release

    5 tasks

    The carrier must accept these goods on this route, and the consignment is not released until the release approver has checked the whole file. The release task is assigned to the release approver alone, and nothing after it can be completed until it is done.

    • Send the carrier the consignment details and the document — the document, the number and mass of packages, any limited quantity information and the collection time, sent to the carrier or forwarder before collection
    • Confirm the carrier accepts the goods — written confirmation that the carrier or forwarder accepts these goods on this route, with any agreement, account set-up, route restriction or crossing rule it needs
    • Check the driver’s ADR training and the instructions in writing — Road under ADR, above the small load threshold: the driver holds an ADR training certificate for the class, and the carrier gives the crew the instructions in writing in a language they understand
    • Put right what the release approver found — after ‘Not released’ only: put right each point the approver recorded, then ask them to check again, change the decision to Released and complete the release task; if the shipment is cancelled, record it here and archive the checklist
    • Approve the consignment for release — the release approver checks the classification, packaging, marks, labels, document, signature, training records and carrier acceptance, and releases the consignment for collection
  8. Phase 8

    Phase 8: Load & Hand Over

    6 tasks

    On the collection day the packages are loaded, kept apart from goods they must not travel with and secured, the vehicle marks or the airline’s acceptance check are made, and the document goes with the goods.

    • Load, segregate and secure the packages — packages loaded the right way up, kept apart from goods they must not travel with and from foodstuffs where the rules say so, and secured so they cannot shift
    • Check the orange plates and the vehicle equipment — Road under ADR, above the small load threshold: plain orange plates at the front and rear of the transport unit, and the fire extinguishers and equipment the instructions in writing list, before the vehicle leaves
    • Apply or check the placards — US road: placards on each side and each end of the vehicle for the classes loaded, unless the load qualifies for the exception for under 454 kg (1,001 lb) aggregate gross weight, and any identification number marking the load needs
    • Give the driver the document — the transport document or shipping paper handed to the driver with the emergency information; in the US, kept within the driver’s reach or in the holder on the driver’s door
    • Hand the consignment to the airline or forwarder for its acceptance check — Air: the packages and the declaration handed over; the airline inspects each package before loading and may use IATA’s acceptance checklists, so put right anything it rejects before the flight
    • Record the handover — when the goods were collected, by whom, the vehicle or flight reference and the signed collection note
  9. Phase 9

    Phase 9: Records & Review

    3 tasks

    Keep the documents for as long as the rules say, follow the consignment to delivery and deal with any incident. Note anything to change before the next consignment.

    • File the documents and keep them for the required period — the document, declaration, packaging certificates, the training records checked and the carrier’s confirmation kept together; in the US, the shipping paper for 2 years after the carrier accepts the goods, or 3 for hazardous waste
    • Confirm delivery and record any incident — delivery confirmed with the consignee, and any leak, damage or rejection recorded and reported where the rules require
    • Note what to change for the next consignment — anything that slowed or nearly stopped this consignment, such as a rejected package, a late certificate or a missing training record, with the change agreed

Dangerous Goods Rules by Mode at a Glance

The rules behind this checklist’s notes, side by side. The mode chosen on the first task shows the tasks for it.

Check Road in Great Britain and Europe (ADR) Road in the US (49 CFR) Air (ICAO Technical Instructions)
Who classifiesThe consignor identifies the hazards and assigns the UN number and proper shipping name.The shipper classes and describes the goods and decides the packaging is authorised (173.22).The shipper. In the US, the shipper also makes sure the goods are not forbidden by air and meet every air packing rule (172.204(c)(3)).
The documentA transport document with the UN number, proper shipping name, class, packing group, packages, total quantity, consignor, consignee and tunnel code where assigned.A shipping paper with the identification number, proper shipping name, class, packing group, total quantity and an emergency response telephone number (172.201, 172.202).A shipper’s declaration. In the US, in duplicate, with the net quantity per package and the statement that all the applicable air transport requirements have been met (172.202, 172.204).
SigningNo shipper’s declaration on the road document; the consignor gives the carrier the document and information.The shipper’s certification, signed by a principal, officer, partner or employee of the shipper or its agent (172.204).The shipper’s declaration, signed by the shipper.
TrainingBefore taking on dangerous goods duties, or under direct supervision until then. DfT: keep records at least 6 years from training, and 2 years after someone leaves.General awareness, function-specific, safety and security awareness; up to 90 days under direct supervision; again every 3 years; records kept while employed and 90 days after (172.704).GOV.UK: anyone packing dangerous goods for air must be specially trained. In the US, the 172.704 training, which may cover the ICAO Technical Instructions.
AdviserA dangerous goods safety adviser, unless an exemption applies (DfT guidance).49 CFR names no adviser role; each hazmat employer is responsible for compliance (172.704(c)(4)).Not covered here: check the ICAO Technical Instructions and your airline.
On the vehicle or aircraftPlain orange plates at the front and rear of a vehicle carrying packages, above the small load threshold.Placards on each side and each end, with an exception below 454 kg (1,001 lb) for the materials in its table 2 (172.504).A Cargo Aircraft Only label where the goods may not go on passenger aircraft; the airline inspects each package before loading (175.30).
Emergency informationThe carrier gives the crew the four-page instructions in writing, in a language they understand.Emergency response information with the shipping paper and a telephone number monitored at all times (172.602, 172.604).In the US, the same 172.602 information, kept on board with the notification to the pilot.
Small amountsLimited quantities (inner packagings within column 7a, boxes up to 30 kg, trays up to 20 kg) and small loads below the threshold for their transport category.A limited quantity by road needs no shipping paper (172.200(b)(3)).In the US, a limited quantity still needs the document (172.200(b)(3)). The package carries the air version of the limited quantity mark.

Where this comes from. 49 CFR Parts 171 to 180 on eCFR (sections 107.601, 171.22, 172.200 to 172.204, 172.301, 172.400a, 172.504, 172.602, 172.604, 172.704, 173.22, 175.30 and 177.817), up to date as of 5 November 2026; HSE’s Carriage of dangerous goods manual; the Department for Transport’s guidance on dangerous goods safety advisers (updated 15 January 2026) and ADR instructions in writing; GOV.UK’s Moving dangerous goods; and the Carriage of Dangerous Goods Regulations 2009, all read on 9 November 2026. ADR is published free by UNECE, whose site could not be read for this page; HSE says it is updated every 2 years, and the UN’s depositary notification C.N.395.2026 (9 October 2026) says the 2027 amendments enter into force on 1 January 2027, so check the ADR points on this page against the edition in force on your collection date. The ICAO Technical Instructions, IATA’s Dangerous Goods Regulations (68th edition from 1 January 2027) and the IMDG Code for sea are paid publications and are not quoted here. IATA publishes its acceptance checklists and the shipper’s declaration form free of charge.

Why Run Dangerous Goods Shipments in CheckFlow?

1

Nobody signs untrained

The first tasks check the training record of everyone who will classify, pack, mark, load or sign, before they do any of it. The person who classifies the goods and signs the document is named on the first task, and every task is assigned from the four people named there.

2

Only the rules for this mode

Choose road under ADR, road under 49 CFR or air on the first task and only that mode’s tasks appear: the adviser and small load check, the registration and placards, or the aircraft limits and the shipper’s declaration. A limited or excepted quantity swaps in its own packing and marking tasks.

3

Nothing leaves before release

The release task is assigned to the release approver alone, and the checklist halts there: loading and handover cannot be completed until the consignment is released. Every due date counts back from the collection date, and you can follow every open consignment in the Reports Grid.

CheckFlow does not classify goods, choose packaging or sign declarations: those stay with your trained people and your dangerous goods safety adviser. CheckFlow makes sure each step is done in order, by the right person, with the record kept.

Clear a new driver to haul hazardous materials with the Commercial Driver Onboarding Checklist, follow the consignment after collection with the Shipment Tracking Workflow Checklist, and check where the goods are stored with the Warehouse Safety Inspection Checklist.

AI generator

Didn’t find what you need? Describe it.

Describe the process in a sentence and the AI checklist generator drafts the phases and tasks for you.

Frequently Asked Questions

What should a dangerous goods shipment checklist include?

The training records of everyone who will handle or sign, the classification (UN number, proper shipping name, class and packing group), whether the goods are forbidden or go as a limited or excepted quantity, authorised packaging, marks and labels, the transport document or shipper’s declaration, the emergency information, the carrier’s acceptance, a release check, loading and segregation, vehicle marks or placards for road, and the records kept. This template covers those steps for one consignment by road or air.

Who can sign a dangerous goods declaration?

In the US, the shipper’s certification is signed by a principal, officer, partner or employee of the shipper or its agent (49 CFR 172.204), and a hazmat employee may not do a regulated job unless trained for it, apart from up to 90 days under direct supervision (172.702 and 172.704). GOV.UK says anyone packing dangerous goods for air must be specially trained. In this template, the trained dangerous goods lead named on the first task signs.

How often is hazmat training required?

In the US, at least once every three years, and a new hazmat employee must complete it within 90 days, working under direct supervision until then (49 CFR 172.704). The record covers the preceding three years and is kept while the employee works for you and for 90 days after. For road under ADR, HSE says training comes before a person takes on dangerous goods duties, and the Department for Transport says employers must keep records for at least 6 years.

Do I need a dangerous goods safety adviser?

In Great Britain, the Department for Transport says a business that consigns, carries, packs, fills, loads or unloads dangerous goods by road, rail or inland waterway regularly needs a dangerous goods safety adviser (DGSA), unless an exemption applies: limited quantities or small loads, occasional carriage, a very short distance between buildings, or private vehicles. It adds that you should employ one if you transport goods internationally. Consignors have needed one since 2022. This template records the adviser, or the exemption relied on, for road under ADR.

What goes on a dangerous goods transport document?

Under ADR, as HSE summarises it: the UN number, proper shipping name, class (with any subsidiary hazard in brackets), packing group, the number and description of packages, the total quantity of each entry, the consignor and consignee, and the tunnel code where one is assigned. A US shipping paper carries the identification number, proper shipping name, class, packing group and total quantity, plus an emergency response telephone number and the shipper’s certification (49 CFR 172.201 to 172.204).

When does a vehicle need hazmat placards?

In the US, a vehicle carrying hazardous materials is placarded on each side and each end, but no placards are needed below 454 kg (1,001 lb) aggregate gross weight of the materials in table 2 of 49 CFR 172.504, except in bulk packagings, nor for marked limited quantities or excepted quantities (172.500(b)). Under ADR, a vehicle carrying packages shows plain orange plates at the front and rear, unless the load is under the small load threshold.

What is a limited quantity shipment?

Dangerous goods in small inner packagings, packed in boxes or shrink-wrapped trays, that travel with fewer requirements. Under ADR, HSE explains, each inner packaging must be within the limit in column 7a of Table A, boxes weigh up to 30 kg and trays up to 20 kg, and the package carries the limited quantity mark. In the US, a limited quantity by road needs no shipping paper, but by air it does (49 CFR 172.200(b)(3)).

How long must dangerous goods shipping papers be kept?

In the US, the person who provides a shipping paper keeps a copy for two years after the first carrier accepts the goods, or three years for hazardous waste (49 CFR 172.201(e)); a road carrier keeps its copy for one year (177.817(f)). The training records are kept separately. In Great Britain, ask your dangerous goods safety adviser how long your documents are kept. This template files the documents together after collection.

Does this template cover dangerous goods by sea?

No. It covers road under ADR or 49 CFR and air under the ICAO Technical Instructions. Sea is governed by the IMDG Code, a paid publication, and GOV.UK says a dangerous goods notification is needed for any dangerous goods sent by sea. A road journey that includes a ferry crossing has a sea leg, so the first task asks for the route and the carrier confirms which rules the crossing needs.

Is CheckFlow free for this template?

14-day free trial, no card required. The Business plan is $10 per user per month after the trial. Full details at checkflow.io/pricing.

Release Every Dangerous Goods Consignment on a Checked File

Free trial — no credit card required.

14-day free trial, no credit cardFull refund in your first 30 daysUS hosting, EU on request