Make-Ready (Unit Turnover) Checklist Template

An empty unit earns no rent until it is ready. Walk it against the move-in report, book the trades in the right order, check the safety records the next tenancy needs, and list it only after a QC inspector signs it off.

Last reviewed: November 2026

Printed from checkflow.io/templates/property-management/make-ready-checklist

This free make-ready checklist is for property managers, maintenance teams and landlords turning one long-term rental unit between residents. One run covers one unit, from the notice to vacate to ready to lease, planned back from a target ready date. It records the notice, offers the resident a visit before they leave, and walks the unit against the move-in report with dated photos. The walk sets the scope, a standard turn or a full make-ready, and the work orders, then vendors are booked in order: clear-out, repairs, paint, flooring and appliances, then the clean. The smoke and carbon monoxide alarms are tested and the safety records the next tenancy needs are checked: in the US, the EPA’s lead paint rules for buildings built before 1978; in England, the EPC, the gas safety record, the electrical safety report and the new rental property register. A QC inspector signs the unit off before it is rekeyed, photographed and listed, and the run ends with the records handed to leasing.

Make-Ready, Holiday-Let Turnover or Move-Out Inspection?

A make-ready is the project between one resident moving out of a long-term rental and the next moving in: the move-out walk, the scope, the work orders and vendors, repairs, paint, flooring and appliances, the safety checks, the clean and a quality control inspection, ending with the rekey, the listing and a unit ready to lease. In the US it is also called a unit turn or an apartment turnover; in the UK the same work is often called void works. One run of this checklist is one unit, planned back from its target ready date.

It sits between other property checklists rather than repeating them. The Move-In / Move-Out Inspection Checklist keeps the condition report, any charges and the deposit; this checklist uses its move-in report and passes it the damage found on the walk. A holiday let cleaned the same day between guests runs on the Short-Term Rental Turnover Checklist. Repairs reported during a tenancy and the planned maintenance calendar belong to the Property Management Maintenance Checklist, and the next resident’s move-in to the Tenant Onboarding Checklist. The tenant turnover section of our property management checklist guide gives the short version of this checklist.

This checklist

Make-ready for a long-term rental

Covers: the move-out walk, scope and budget, work orders and vendors, repairs, paint, flooring, appliances, alarms and safety records, the clean, the QC sign-off, rekey and listing.

Planned around: the target ready date, which this template sets 11 working days after the move-out and moves later at the scope approval for a full make-ready.

Output: a unit ready to lease, with the records the next resident must receive.

Holiday let

Short-term rental turnover

Covers: the clean, linen, restocking and checks between two guests’ stays.

Planned around: check-out and the next check-in, often the same day.

Output: a let ready for the next guest, in the Short-Term Rental Turnover Checklist.

Condition and deposit

Move-in and move-out inspection

Covers: the condition report at each end of a tenancy, wear and tear against damage, and any deductions from the deposit.

Planned around: the move-in and move-out days.

Output: a signed report and the deposit dealt with, in the Move-In / Move-Out Inspection Checklist.

What the Make-Ready Checklist Covers

Nine phases take one unit from the notice to vacate to ready to lease. The first task records the move-out date, the target ready date, which sets every due date, and where the unit is. A US building built before 1978, or of unknown age, adds the EPA’s lead paint steps: the RRP check and lead-safe work for paint jobs, and the lead disclosure for the next lease. England adds the EPC, gas safety record, electrical safety report, council licensing and rental property register tasks, and Wales, Scotland or Northern Ireland the EPC, gas and electrical tasks with a note to check that nation’s rules. Pests or damp ticked on the move-out walk add their own tasks, and a full make-ready adds the owner’s approval, ordering and fitting the replacements. The QC inspector’s sign-off is the gate before the rekey and listing: Not passed keeps the checklist halted and adds a task to put right what failed.

  1. Phase 1

    Phase 1: Notice to Vacate & Ready Date

    6 tasks

    Owned by the property manager. Enter the move-out date and the target ready date on the first task: every due date counts back from the ready date in working days, and this template plans the move-out walk 10 working days before it. Say where the unit is, and for the US whether the building was built before 1978: that answer adds the lead paint steps, the UK safety records or the local checks, with notes for the country.

    • Set up the turn: the unit, the dates and the people — the property and unit, the move-out date, the target ready date, where the unit is and when the building was built, and the people; later tasks are assigned from these fields and every due date counts back from the ready date
    • Record the notice to vacate and check it against the lease — the date the notice arrived, the move-out date it gives, whether it is in writing and meets the notice the lease or tenancy needs, and the resident’s forwarding address
    • Pull the move-in report, photos and the unit’s history — the move-in condition report and photos, past work orders, the age of the paint, flooring and appliances, warranties, paint colours and anything the resident reported during the tenancy
    • Check the EPC is valid, and meets any minimum rating, before the unit is advertised — find the certificate on the Find an energy certificate service, note its rating and the date it ends, and order a new one if there is none or it is out of date; in England and Wales the rating must be E or above unless an exemption is registered
    • Give the leasing agent the move-out and ready dates — so they can plan marketing and viewings around the ready date, and know what work is planned
    • Pencil in the vendors for the turn — the cleaners, painters, flooring, pest control and any trade the history suggests, held for the dates between the move-out and the ready date and confirmed after the walk
  2. Phase 2

    Phase 2: Move-Out Walk & Photos

    6 tasks

    A visit before the resident leaves, then the move-out walk against the move-in report, with dated photos. Anything that needs a specialist, such as pests or damp, is ticked on the walk and adds its task in Phase 4. Charges and the deposit stay in the Move-In / Move-Out Inspection Checklist.

    • Offer the resident a visit before they move out — walk the unit with them, explain the move-out standard and what will be checked, and note work you can plan for now
    • Collect the keys, fobs, remotes and permits — every key, fob, garage or gate remote and parking permit handed out at the move-in, checked against the key log, with anything missing noted for the rekey
    • Walk the unit room by room against the move-in report — each room, fixture and appliance compared with the move-in report, with what is normal wear and what is damage, and the work each item needs
    • Take dated photos of every room — wide shots of each room and close-ups of any damage, dated, kept with the unit’s file for the work orders and the next move-in report
    • Read the meters and secure the empty unit — meter readings taken, the utilities moved into the owner’s name for the empty period, the heating set to protect against frost, windows and doors locked, and the water turned off where the unit will be empty for long
    • Pass any damage charges to the move-out inspection — the items the walk found as damage, with photos and the cost of the work, sent to whoever runs the Move-In / Move-Out Inspection Checklist for this resident; the condition report, any deductions and the deposit are handled there, not here
  3. Phase 3

    Phase 3: Scope & Budget

    6 tasks

    The walk decides the scope. A standard turn is touch-up paint, carpet cleaning and minor repairs; a full make-ready replaces flooring, appliances or fixtures and adds the owner’s approval, ordering and fitting tasks. These definitions are this template’s, so set your own. If the work needs longer than the plan allows, move the target ready date when the scope is approved. For a US building built before 1978, the paint work is checked against the EPA’s Renovation, Repair and Painting rule here.

    • Set the scope: a standard turn or a full make-ready — from the walk, the unit’s history and the budget, with the reason for the choice
    • Write the work orders by trade — one line per job, with the trade, who does it (staff or vendor) and the estimate, so the schedule and the budget come from one list
    • Check the paint work against the EPA’s RRP rule — for housing built before 1978, decide whether any job disturbs painted surfaces beyond the rule’s minor repair and maintenance limits, and if so book a lead-safe certified firm with a certified renovator assigned to the job
    • Get quotes for the larger jobs — quotes for any job over the spending limit in the management agreement, compared on price, dates and what is included, so the scope can be approved
    • Get the owner’s approval for the full make-ready budget — the replacement items, their cost and the effect on the ready date, approved in writing by the owner or asset manager
    • Approve the scope, budget and schedule — the property manager approves the work orders and their total against the budget, and confirms the ready date still holds; if it does not, change the target ready date on the first task and every due date moves
  4. Phase 4

    Phase 4: Work Orders & Vendor Schedule

    5 tasks

    Vendors are booked in the order the work needs: clear-out and any specialist treatment first, then repairs, paint, flooring and the clean last, so no trade undoes another. Long-lead items are ordered now for a full make-ready.

    • Book the vendors in order and send the work orders — each vendor or staff member booked with a date and access arranged: clear-out, specialist work, repairs, paint, flooring, then the clean
    • Order the long-lead items for the full make-ready — flooring, appliances, worktops, cabinets or fixtures ordered, with delivery dates checked against the schedule
    • Clear out what was left behind — rubbish, furniture, food and anything else the resident left removed; check the lease and local law before disposing of anything of value, and note what was kept
    • Book pest treatment and confirm the unit is clear — a treatment booked with a qualified (in the US, licensed) pest controller, neighbouring units checked where the pest spreads, and the unit confirmed clear before the clean
    • Find and fix the cause of damp, mould or a leak — the source found and repaired, affected materials dried or replaced, and mould treated before the unit is painted
  5. Phase 5

    Phase 5: Repairs, Paint, Flooring & Appliances

    7 tasks

    Repairs and the systems first, then the paint, then the flooring, so new floors are not splashed. In a US building built before 1978, paint work above the minor repair limits follows the RRP rule’s work practices and ends with the cleaning verification.

    • Make the repairs on the work orders — doors, locks, handles and hinges, cupboard doors, window catches and blinds, holes in walls, fixtures and fittings, with each work order closed as it is done
    • Check the plumbing, heating, cooling and hot water — taps, toilets, showers and drains run and checked for leaks, the water heater or boiler and the heating working, air conditioning tested where there is any, and filters changed
    • Check, clean or replace the appliances — oven and hob, extractor, fridge and freezer, dishwasher, washing machine, dryer and microwave run, cleaned and checked, with any replacement recorded
    • Fit the replacements in the full make-ready — the flooring, worktops, cabinets, fixtures or appliances ordered for the full make-ready fitted, with warranties and manuals kept with the unit’s file
    • Paint the unit — touch-up for a standard turn or a full repaint for a full make-ready, walls, ceilings, doors and trim, with the colours and codes recorded for the next turn
    • Use lead-safe work practices and verify the cleaning — for paint work above the minor repair limits in housing built before 1978: a certified renovator assigned, the work area marked with signs and contained, no prohibited practices, and the cleaning verification done by the certified renovator before the work area is opened; the firm keeps its records for 3 years
    • Clean, repair or replace the flooring — carpets cleaned or replaced, hard floors repaired or refinished, and thresholds and skirting checked, after the paint is finished
  6. Phase 6

    Phase 6: Safety Devices & Certificates

    5 tasks

    The alarms, locks and escape routes every unit needs, then the records the next tenancy needs. England gets the gas safety record and the electrical safety report, with their rules. Wales, Scotland and Northern Ireland get the same two tasks: the gas regulation covers Wales and Scotland too, and the notes say where to check the nation’s own rules. The US and England get a check of local registration, licensing and inspection rules.

    • Test the smoke and carbon monoxide alarms — each alarm tested, batteries changed, and any alarm that fails or is past the manufacturer’s replacement date replaced, with where each alarm is
    • Check the doors, window locks and escape routes — entrance door locks and closers, window locks and restrictors, windows that are escape routes opening fully, handrails, and outside lights
    • Check the gas safety record covers the new tenancy — every gas appliance and flue checked within the last 12 months by a registered gas engineer, the record on file, and a new check booked if the last one will be more than 12 months old when the tenancy starts
    • Check the electrical safety report is in date — the most recent electrical installation report, the date by which it says the next inspection is due, and any remedial work it asks for done and confirmed in writing
    • Check local registration, licensing and inspection rules — whether the council, city or county requires the unit to be registered or licensed, or inspected before the next tenancy, and anything due booked before the ready date
  7. Phase 7

    Phase 7: The Clean

    3 tasks

    The clean comes after every trade has finished, so the unit is shown and inspected as the next resident will find it.

    • Clean the unit top to bottom — kitchen, inside the appliances and cupboards, bathrooms, windows, sills and blinds, vents and light fittings, skirting, floors and any balcony
    • Run the taps and fit new bulbs, filters and batteries — every tap and shower run to flush water that stood while the unit was empty, bulbs replaced, extractor and air filters changed, remote and thermostat batteries replaced, and the heating set for viewings
    • Check the outside spaces that come with the unit — balcony or patio, garden, parking space, storage and bin area cleared and clean
  8. Phase 8

    Phase 8: Quality Control Inspection

    4 tasks

    The QC inspector walks the finished unit and records snags, the maintenance team fixes them, and the inspector signs the unit off as ready. The checklist halts at the sign-off: nothing after it can be completed until the inspector approves. Not passed keeps it halted and adds a task to put right what failed.

    • Inspect the unit room by room against the make-ready standard — each room checked as a new resident would see it: paint, floors, fixtures, appliances, the clean, the alarms, and every work order closed, with the snags listed
    • Fix the snags from the inspection — each snag fixed and the line ticked on the inspection table, before the inspector’s sign-off
    • Put right what failed the inspection — after a Not passed decision only: fix what the inspector recorded, ask them to inspect again, and change the decision on the sign-off to Passed when it passes; if the ready date will slip, change the target ready date on the first task and every due date moves
    • Sign off the unit as ready to lease — Passed or Not passed, with what was checked, recorded by the QC inspector alone
  9. Phase 9

    Phase 9: Rekey, Listing & Ready to Lease

    8 tasks

    After the sign-off: the locks are changed once the last vendor has left, the listing photos are taken, the listing is updated with the rent and the date, the records the next resident must receive are handed to leasing, and the unit is marked ready to lease.

    • Rekey or change the locks and log the new keys — every lock the last resident or a vendor could open rekeyed or changed after the last vendor has left, codes and fobs reset, and the new keys logged
    • Take the listing photos — every room photographed in daylight after the clean and the sign-off, with the outside spaces and any shared facilities
    • Update the listing with the rent and the ready date — the advert updated with the photos, the rent, the date the unit is available and what is included, and viewings opened
    • Check the rental property registration for the next tenancy — whether the property is, or must be, on the Register your rental property service when the next tenancy starts, and that its gas, electrical and EPC details are up to date there
    • Hand the unit’s records to leasing for the move-in — the records the next resident must receive before they move in, the key log, the appliance manuals and the unit’s condition, passed to whoever runs the move-in
    • Prepare the lead disclosure for the next lease — the EPA’s Protect Your Family From Lead in Your Home pamphlet, what is known about lead-based paint and its hazards in the unit, and every record or report about it, including any from this turn, ready for leasing to give before the next resident signs
    • Mark the unit ready to lease — the actual ready date recorded, the unit status changed to ready in your systems, and the next resident’s screening and move-in started
    • Review the turn: cost, time and what to change — the actual cost against the budget, the working days from the move-out to ready, what held the turn up, and notes for the next turn of this unit

The Rules Behind the Turn, and the Scope

The rules behind a unit turn, by country

The first task’s answer adds the tasks for the country, and the notes quote the rule.

Rule Where it applies What it asks of the turn Where it shows
EPA Renovation, Repair and Painting rule (40 CFR 745, subpart E)United States, housing built before 1978Paid work that disturbs paint beyond the minor repair limits (6 square feet per room inside, 20 outside) is done by a certified firm with a certified renovator, using lead-safe practices and a cleaning verification; the owner gets the Renovate Right pamphlet no more than 60 days before; records kept 3 yearsPhases 3 and 5
Lead disclosure rule (EPA 40 CFR 745, subpart F; HUD 24 CFR 35, subpart A)United States, leases of housing built before 1978, with exceptionsBefore the lease binds the tenant: the pamphlet, known lead-based paint and hazards, the records and reports, and the Lead Warning Statement in or with the lease; a copy kept 3 yearsPhase 9, or before signing if the unit is let earlier
Fair Housing Act, 42 U.S.C. 3604(c)United StatesNo advert that indicates a preference, limitation or discrimination based on a protected characteristicPhases 1 and 9
Gas Safety (Installation and Use) Regulations 1998, regulation 36England, Wales and ScotlandEach appliance and flue checked within 12 months before a new lease starts, and every 12 months after; a copy of the last record to the new tenant before they occupyPhases 6 and 9
Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, regulation 3EnglandAn inspection and test in place before the tenancy starts (a report under 5 years old with no work outstanding is enough, the guidance says) and at least every 5 years; remedial work within 28 days; a copy of the most recent report to the new tenant before they occupyPhases 6 and 9
Smoke and Carbon Monoxide Alarm (England) Regulations 2015, as amended in 2022 and 2026EnglandA smoke alarm on each storey with living accommodation, a carbon monoxide alarm in rooms with a fixed combustion appliance other than a gas cooker, and every alarm checked on the day a new tenancy beginsPhase 6, then the move-in
Energy Performance Certificates and the minimum energy efficiency standardEngland and WalesAn EPC ordered before the home is marketed, valid for 10 years, and a copy given to the new tenant free of charge; no new tenancy below band E unless an exemption is registeredPhases 1 and 9
House in multiple occupation licensingEngland and WalesA licence for a large HMO, and in some areas for smaller lets too: check with the councilPhase 6
Renters’ Rights Act 2025, changes from 1 May 2026EnglandNew tenancies are assured periodic; tenants give 2 months’ notice; adverts state a specific rent and no higher offer is accepted; no rent before signing, then at most 1 month in advance; no refusal because a tenant is on benefits or has childrenPhases 1 and 9
Register your rental property serviceEngland, by region from 15 December 2026Landlords register themselves and their let properties, with the gas, electrical and EPC evidence; £65 per property a yearPhase 9

Standard turn or full make-ready

This template’s definitions, chosen on the scope task after the move-out walk. Set your own.

Work Standard turn Full make-ready
PaintTouch-up of marks and patchesWalls, ceilings, doors and trim repainted
FlooringCarpets cleaned, small repairs to hard floorsWorn flooring replaced
Appliances and fixturesCleaned, repaired where neededReplaced where worn or out of date
ApprovalThe property manager approves the scope and budgetThe owner also approves the budget in writing
Extra tasks in this checklistNoneOwner’s approval, ordering long-lead items, fitting the replacements

Recent changes. The England electrical regulations were renamed and amended to cover social housing, with changes in force from 1 November 2025 and 1 May 2026. The Renters’ Rights Act changes took effect on 1 May 2026, and gov.uk’s rental property register guidance was published on 29 October 2026: it says empty properties will later have to be registered before they are marketed, and adverts will have to show the registration numbers, with no date yet. Each row is summarised from the CFR text (Cornell LII), the EPA, legislation.gov.uk or gov.uk, read on 3 November 2026.

Wales, Scotland and Northern Ireland. The gas safety regulation covers Wales and Scotland as well as England, and the energy efficiency standard covers Wales. The electrical, alarm and Renters’ Rights Act rules above are England’s; the other nations have their own, and the checklist’s notes tell you to check them. Northern Ireland has its own gas safety regulations.

Outside these rules. US state and local law sets the notice a resident gives, entry, alarms and any rental registration or inspection; this template names no state’s rule.

Why Run Unit Turns in CheckFlow?

1

Nothing is listed before it passes QC

The QC sign-off is assigned to the inspector alone, and the checklist halts there: the rekey, the listing photos, the listing and ready to lease cannot be completed until the unit passes. Not passed keeps the checklist halted and adds a task for the maintenance team to put right what failed, with the way back to the sign-off in its text.

2

The safety steps for the unit’s country

A US building built before 1978 gets the EPA’s RRP check, lead-safe work and the lead disclosure for the next lease. England gets the EPC, the gas safety record, the electrical safety report, a council licensing check and the rental property register, with notes quoting each rule. Wales, Scotland and Northern Ireland get the EPC, gas and electrical tasks with a note to check that nation’s rules.

3

Every unit on its own ready date

Name the property manager, maintenance supervisor, leasing agent and QC inspector on the first task, and every task is assigned from those fields. Due dates count back from the target ready date in working days, so moving it moves the whole turn. The Reports Grid shows every unit being turned with its answers, and Analytics shows overdue and late tasks by person and step.

CheckFlow does not give legal advice, test for lead or certify a gas or electrical installation: those stay with your advisers, certified firms and engineers. It makes sure every step of the turn is done in order, with an owner and a due date, a sign-off before the unit is listed and a record of who did what. CheckFlow’s property management checklist software shows how the same approach handles the rest of a portfolio.

When the resident stays, the Lease Renewal Checklist replaces the turn. A large refurbishment handed over by a contractor can use the Construction Punch List Checklist for its snags.

AI generator

Didn’t find what you need? Describe it.

Describe the process in a sentence and the AI checklist generator drafts the phases and tasks for you.

Frequently Asked Questions

What is a make-ready checklist?

A make-ready checklist lists the work that gets a vacated rental unit ready for its next resident: the move-out walk, repairs, paint, flooring, appliances, the alarms and safety records, the clean and a final quality control inspection. In this template one run is one unit, planned back from the target ready date, with every task assigned and dated. ‘Make-ready’ and ‘unit turn’ are US property management terms for the same job.

What should an apartment turnover checklist include?

For a long-term rental: the notice to vacate and a target ready date, a visit before the move-out, the move-out walk with photos against the move-in report, the scope and the work orders, vendors booked in order, repairs, paint, flooring and appliances, the alarms and any safety records the next tenancy needs, the clean, a quality control inspection, the rekey, listing photos and the hand-over to leasing. A holiday let cleaned between guests needs the Short-Term Rental Turnover Checklist instead.

How long should a make-ready take?

No rule sets it: it depends on the scope, the vendors and the parts. This template plans 10 working days from the move-out walk to the target ready date, as its own choice. When the walk shows a full make-ready with new flooring or appliances, move the ready date later on the scope approval, so the replacements have time to arrive. Every due date counts back from the ready date, and finished tasks stay done when it moves.

What is the difference between a standard turn and a full make-ready?

In this template a standard turn is touch-up paint, carpet cleaning and minor repairs, and a full make-ready is a full repaint with flooring, appliances or fixtures replaced. Choosing the full make-ready after the move-out walk adds the owner’s written approval of the budget, ordering long-lead items and fitting the replacements. The definitions are this template’s choice, so adjust the scope task’s text to match your own.

Who should do the quality control inspection on a unit turn?

This template assigns it to a QC inspector chosen on the first task and suggests someone who did not do the work, such as the property manager or a senior technician. They walk the unit room by room, list the snags, and sign it off as Passed or Not passed once the snags are fixed. The checklist halts at the sign-off, so the rekey, listing and ready-to-lease steps wait until the unit passes.

Do I need an RRP-certified contractor to paint a rental unit?

In the US, if the building was built before 1978 and the work disturbs more paint than the EPA’s minor repair limits (6 square feet per room inside, 20 square feet outside, with no window replacement or demolition), it must be done by a lead-safe certified firm with a certified renovator, using lead-safe practices and a cleaning verification. The EPA says property management companies that do such work must be certified too. Some states run their own programmes.

What lead paint disclosure does a new tenant get in the US?

For housing built before 1978, before the tenant is bound by the lease the landlord gives them the EPA’s Protect Your Family From Lead in Your Home pamphlet, discloses any known lead-based paint and hazards, hands over the available records and reports, and puts the Lead Warning Statement in or with the lease, keeping a copy for 3 years. Leases of 100 days or less that cannot be renewed, and housing certified free of lead-based paint, are exempt.

What void works must a landlord in England finish before a new tenancy?

Void works is the UK term for work done while a let home is empty between tenants. Before the next tenant moves in, a landlord in England gives them the last gas safety record, the most recent electrical safety report and a copy of the EPC, which is ordered before advertising and must be band E or above unless an exemption is registered, and checks the smoke and carbon monoxide alarms work on the day the tenancy begins. The gas rule also covers Wales and Scotland.

What did the Renters’ Rights Act change for re-letting a home in England?

From 1 May 2026 new private tenancies in England are assured periodic tenancies with no end date, and tenants give 2 months’ notice to leave. Adverts must state a specific rent and landlords cannot accept offers above it, no rent can be taken before the agreement is signed and then at most 1 month in advance, and landlords cannot refuse tenants on benefits or with children. Registration on the new rental property register opens region by region from 15 December 2026.

Is CheckFlow free for this template?

14-day free trial, no card required. The Business plan is $10 per user per month after the trial. Full details at checkflow.io/pricing.

Turn Every Unit on Time, and List It Only When It Passes QC

Free trial — no credit card required.

14-day free trial, no credit cardFull refund in your first 30 daysUS hosting, EU on request