Dental Practice Infection Control Checklist Template

A dental practice’s infection control rests on routine work done every day: steriliser tests signed before first use, waterlines flushed, instruments cleaned, inspected and stored within their dates. The check nobody owns is the one that gets missed.

Last reviewed: October 2026

Printed from checkflow.io/templates/healthcare-medical/dental-practice-infection-control-checklist

This free dental infection control checklist is for practice managers, IPC and decontamination leads and dental nurses who run a practice’s infection prevention and control routine. One run is one week. It sets the decontamination rota, logs each day’s start-of-day checks, steriliser tests and waterline flushes, spot-checks cleaning and glove changes between patients, follows instruments from the surgery through cleaning, inspection, sterilisation and storage, and closes each day with the waterlines, the steriliser and clinical waste. Weekly tests run once, and the quarterly tests, the six-monthly decontamination audit and annual validation appear in the weeks that include them. The IPC lead reviews the logs and signs off the week, and anything that failed gets an owner and a re-check. Answers on the first task show the tasks for your cleaning method and notes for England (HTM 01-05) or the United States (CDC). The checklist supports your own infection control policy and each manufacturer’s instructions for use; it does not replace them.

A Weekly Routine, Not an Audit

Infection control in a dental practice is mostly routine: the same checks before the first patient, between patients and at the end of the day, and the same decontamination steps for every set of instruments. This checklist runs that routine for one week and keeps the logs together, with a named person for each check and the IPC lead’s sign-off at the end. It supports the practice’s own infection control policy and each manufacturer’s instructions for use, and does not replace them.

It sits beside two audits. The Infection Control Audit Checklist audits one area against the standard precautions and scores the result, and the Hand Hygiene Audit Checklist counts what staff do at each moment for hand hygiene. In England, HTM 01-05 asks practices to audit their decontamination processes at least every six months, and that audit appears in this checklist in the week it is due. Instrument reprocessing in a hospital sterile services department follows the Medical Equipment Sterilization Checklist instead.

Weekly routine

Runs the practice’s daily and weekly checks

Asks: were the checks, tests and logs done each day this week, by the person named?

When: every week, started on a recurring schedule.

Output: the week’s signed logs, actions for anything that failed, and the IPC lead’s sign-off.

Infection control audit

Scores practice against the standards

Asks: how well does the practice follow the standards it audits against?

When: on the cycle your policy sets; for decontamination in England, at least every six months.

Output: scores, findings and an action plan with owners.

Sterilisation process

Follows one load through reprocessing

Asks: was this set of instruments cleaned, inspected, packed, sterilised and stored correctly?

When: for each load.

Output: a traceable record for the load.

What the Dental Practice Infection Control Checklist Covers

Nine phases take one week of a dental practice’s infection prevention and control routine from the rota to the IPC lead’s sign-off. One run is one week because the routine repeats weekly: the daily checks are logged day by day in tables, the weekly tests run once, and the quarterly, six-monthly and annual tasks appear only in the weeks that include them. Answers on the first task show the tasks for your cleaning method and notes for England or the United States, and Phase 9 appears only when something is still open at the review.

  1. Phase 1

    Phase 1: Plan the Week

    4 tasks

    Answer the questions on the first task first. They show the washer-disinfector and ultrasonic tasks your practice needs, the quarterly, six-monthly and annual tasks in the weeks that include them, and the notes for your country. Every due date counts from the Monday the week starts, in working days.

    • Record the practice, the week and who does what — the practice, the Monday the week starts, the country, how instruments are cleaned, the sterilisers in use, whether this week includes the quarterly, six-monthly or annual tasks, and the IPC lead, the decontamination user, the dental nurse on decontamination and the practice manager
    • Set the decontamination rota for each day — who runs decontamination and the surgery checks each day, and who covers, so every daily check has a named person
    • Pick up last week’s open faults and actions — anything still withdrawn from use, service visits booked, and any action carried over from last week’s sign-off
    • Check instructions and logbooks are at the decontamination area — the manufacturer’s instructions for each machine, instrument and cleaning product, the written cleaning protocol, and a logbook for each steriliser, washer-disinfector and ultrasonic cleaner
  2. Phase 2

    Phase 2: Start of Day

    8 tasks

    Do these before the first patient each day and log each day in the table. The steriliser must pass its daily tests before it is used for instruments. The washer-disinfector and ultrasonic tasks appear for the cleaning method on the first task.

    • Flush the dental unit waterlines at the start of the day — every surgery’s waterlines flushed before the first patient, and any self-contained water bottle refilled with distilled or reverse osmosis (RO) water, as the dental unit’s instructions say
    • Check each surgery is clean and ready before the first patient — work surfaces, the chair and the delivery unit clean, nothing left out on open work surfaces, and instruments for the session kept covered in drawers or cupboards until they are needed
    • Check PPE is stocked in each surgery and the decontamination area — powder-free disposable gloves in the right sizes with a non-latex choice, household gloves for manual cleaning, disposable aprons, masks, and eye protection or visors
    • Check hand hygiene supplies at every wash-hand basin — liquid soap in wall-mounted dispensers, disposable paper towels and a hand hygiene poster at each basin, and basins kept for hands only, never for instruments
    • Check the sharps containers in each surgery — puncture-resistant containers close to where sharps are used, assembled and labelled as your sharps policy says, and not filled past the line the container marks
    • Run the steriliser’s daily tests before first use — door seal cleaned, chamber and shelves checked, reservoir filled with distilled or RO water, any warm-up cycle the manufacturer asks for, then the automatic control test and, on a vacuum steriliser, the steam penetration test, with the temperature and pressure recorded and signed
    • Run the washer-disinfector’s daily checks — shown when the practice uses a washer-disinfector: strainers and filters removed and cleaned before the first cycle, and every load checked by eye for cleanliness as it comes out
    • Run the ultrasonic cleaner’s daily checks — shown when the practice uses an ultrasonic cleaner: strainers and filters cleaned, the solution made up as the manufacturer says and changed at the end of every session, and the tank drained at the end of the day
  3. Phase 3

    Phase 3: Between Patients

    5 tasks

    These steps happen after every patient, so this phase is a spot check. The IPC lead watches at least one session this week and records what they saw, not what staff say they usually do.

    • Check clinical contact surfaces are cleaned between patients — work surfaces, the chair, curing light, inspection light handles, hand controls, delivery unit, spittoon, aspirator and X-ray unit cleaned after each patient, with single-use covers replaced
    • Check waterlines are flushed between patients — the waterlines run through between patients as the practice’s protocol says, and sterile water or sterile saline from a separate single-use source used for surgical procedures
    • Check each patient has their own sterilised instrument tray — a separate tray set out for each patient, instruments taken out before treatment starts, and everything set out treated as contaminated afterwards, used or not
    • Check single-use items are used once and discarded — items marked with the single-use symbol thrown away after one treatment, and endodontic files and reamers used for one patient only
    • Check hand hygiene and glove changes at each patient — hands cleaned before and after each patient and before and after gloves, a new pair of gloves for every patient, no jewellery beyond what your policy allows, and nails short with no varnish or false nails
  4. Phase 4

    Phase 4: Instrument Decontamination

    7 tasks

    Instruments move one way, from dirty to clean, through cleaning, inspection, sterilisation and storage. Follow each instrument’s and each machine’s instructions for use. A failed test or cycle adds a task to withdraw the machine and reprocess the affected instruments.

    • Move used instruments to decontamination in a closed container — a leak-proof, rigid container with a secure lid, marked for used instruments and never used for clean ones, taken to the decontamination area as soon as possible so the instruments do not dry
    • Clean instruments in the washer-disinfector — shown when the practice uses one: carriers not overloaded, hinges and joints opened, instruments that need irrigation connected, and each cycle’s parameters recorded
    • Clean instruments in the ultrasonic cleaner or by hand, following the written protocol — shown for ultrasonic or manual cleaning: in the ultrasonic cleaner, instruments in a basket and the lid closed for the whole cycle; by hand, instruments kept under the water and scrubbed with a long-handled soft brush, then rinsed in a separate sink
    • Inspect every instrument under an illuminated magnifier — joints, hinges and serrated jaws checked for blood or dental material, dirty instruments cleaned again, damaged, blunt or corroded ones taken out of use, and hinged instruments and handpieces lubricated as their manufacturers say
    • Sterilise each load and keep the cycle record — a cycle suited to the load, wrapped instruments only in a vacuum steriliser, and for every cycle the printout or a record of the date, the cycle passing, the temperature and pressure reached and the operator’s signature
    • Withdraw the machine and reprocess the affected instruments — shown when a test or cycle failed: the machine taken out of use until it is repaired and passes its tests, the manufacturer or service engineer called, and instruments from the failed cycle cleaned and sterilised again before use
    • Package, label and store sterilised instruments — each pack or tray dated with the day it was processed or the date it must be used by, kept dry and covered away from the dental chair, used first in, first out, and checked intact before use
  5. Phase 5

    Phase 5: End of Day

    6 tasks

    Close down each surgery and the decontamination area at the end of every day. Clinical waste is kept apart and stored securely until the contractor collects it.

    • Flush and drain the waterlines at the end of the day — waterlines flushed, self-contained bottles removed, flushed with distilled or RO water, left open to dry overnight and stored upside down, in-line filters cleaned at the end of each session and disposable filters replaced daily, or as the manufacturer says if it asks for more
    • Clean each surgery at the end of every session — taps, drainage points, splashbacks and sinks after each session, spittoons and aspirators washed through as the manufacturer says, and cupboard doors, light fittings and the whole floor each day
    • Empty and clean the steriliser at the end of the day — the reservoir drained and cleaned, the chamber dried, the door left open overnight, and distilled or RO water left in opened containers thrown away
    • Reprocess unwrapped instruments left in the surgeries — unwrapped instruments kept in a clinical area reprocessed at the end of the day, used or not, or at the start of the next working day
    • Segregate clinical waste and store it securely — used gloves, aprons, masks and other clinical waste in the bags and containers your waste policy names, sharps in sharps containers, and full bags and containers closed, labelled and kept in a secure store until collection
    • Record each clinical waste collection — the date, what was collected and by which contractor, with the paperwork they leave filed as your waste policy says
  6. Phase 6

    Phase 6: Weekly Tasks

    9 tasks

    Do these once during the week. The washer-disinfector and ultrasonic tests appear for the cleaning method on the first task, and the spore test for practices in the United States. Where a manufacturer sets its own schedule, follow it.

    • Run the steriliser’s weekly tests — an air leakage test on each vacuum steriliser (type B or S) and a residual air test on each type S or N, as well as the daily tests and any extra tests the manufacturer sets, recorded and signed in the logbook
    • Run the weekly spore test on each steriliser — shown for practices in the United States: a biological indicator run in each steriliser at least weekly, as the indicator and steriliser manufacturers say, with the result recorded and acted on
    • Run the washer-disinfector’s weekly tests — shown when the practice uses one: a protein residue test and a check of the door seal, as well as the daily checks
    • Run the ultrasonic cleaner’s weekly tests — shown when the practice uses one: a check of the lid seal and a protein residue test, as well as the daily checks
    • Disinfect the waterlines on the manufacturer’s schedule — the dental unit’s waterline disinfection done when its manufacturer’s instructions say, with only the products they name, flushed through before clinical use, and any water quality testing the manufacturer recommends recorded
    • Clean the weekly items in each surgery and the decontamination room — window blinds, accessible ventilation fittings, shelving, radiators and shelves in cupboards
    • Replace household gloves and refresh the blood spill solution — household gloves replaced each week, or sooner if worn or torn, and any hypochlorite solution for blood spills made up fresh or at least weekly in a clean container
    • Flush little-used taps and the waterlines of any surgery not in use — taps used only now and then flushed once a week, and the waterlines of a surgery closed for a while drained and disconnected as the manufacturer says, or flushed weekly
    • Check stored instrument packs are within their dates — wrapped packs within their use-by date, unwrapped instruments in a non-clinical area no more than a week old, anything out of date reprocessed, and packs rotated first in, first out
  7. Phase 7

    Phase 7: Quarterly, Six-Monthly & Annual Tasks

    6 tasks

    The tasks in this phase appear only when the first task says this week includes them: the quarterly equipment tests and records review, the six-monthly decontamination audit, or an annual validation or service. In other weeks the phase is empty.

    • Have the quarterly equipment tests done — the quarterly tests the manufacturer or the HTM schedule sets for each steriliser, washer-disinfector and ultrasonic cleaner, carried out by the competent person or service engineer, with their signed report filed in the logbook
    • Review staff training records for infection control and decontamination — induction training, hand hygiene training through the year, training on each machine for everyone who runs its tests, and each clinician’s continuing professional development in this area
    • Review staff immunisation and occupational health records — hepatitis B immunisation for staff involved in decontamination, the other immunisations your policy lists, occupational health arrangements, and the record of sharps injuries
    • Check the infection control policy and procedures are in date — the policy reviewed on time, a named lead for infection control and decontamination, a written procedure for each process, and the plan for moving towards best practice kept up to date
    • Run the six-monthly decontamination audit — the practice’s decontamination processes audited with the audit tool your policy names, the results filed for inspection with their actions, and the next review set by the outcome
    • Have the annual validation, service and pressure vessel examination done — each steriliser, washer-disinfector and ultrasonic cleaner validated and serviced as its manufacturer says, each steriliser examined under the pressure systems written scheme, and the reports signed and filed
  8. Phase 8

    Phase 8: Review & Sign-off

    4 tasks

    The IPC lead reviews the week’s logs and signs the week off. Anything still open adds Phase 9. Nothing after the sign-off can be completed until the IPC lead records a decision.

    • Check every log for the week is complete and signed — each daily and weekly record filled in for every day the practice was open, and signed by the person responsible before the equipment went back into use
    • List anything that failed, was missed or needs action — every failed test, fault, missed check and problem recorded this week, what was done about it on the day, and what still needs action
    • IPC lead reviews and signs off the week — Signed off, Signed off with actions or Not signed off, with the reasons and any conditions recorded
    • Carry open items into next week’s checklist — next week’s checklist started or scheduled, with open actions, withdrawn equipment and booked service visits noted on it
  9. Phase 9

    Phase 9: Actions for Anything That Failed

    3 tasks

    Shown only when something is still open at the review. Each item is put right by its owner, checked again, and closed by the IPC lead.

    • Put right each open item — each fault repaired, test repeated, supply restocked or member of staff retrained, with the evidence recorded
    • Re-check each item that was put right — the same check or test repeated and passed before the equipment or process goes back into use, and the result recorded
    • IPC lead closes the actions — or carries any item still open into next week’s checklist

Decontamination Tests and Checks: How Often and Who Does Them

How often each decontamination test and check is done, who does it and where the frequency comes from. The England rows quote HTM 01-05 (2013 edition) and the United States rows quote CDC’s dental infection prevention pages. Where a manufacturer sets its own schedule, follow it.

Test or check How often Who does it Source
Steriliser steam penetration test (Helix or Bowie-Dick), vacuum sterilisers only, and automatic control test, with the temperature and pressure recordedDaily, before the steriliser is used for instrumentsUser or, by delegation, operatorEngland: HTM 01-05 paragraphs 4.16 to 4.21 and 12.5
Steriliser air leakage test (type B and S) and residual air test (type S and N)Weekly, with the daily testsUser or, by delegation, operatorEngland: HTM 01-05 paragraph 12.5
Steriliser thermometric testsQuarterly, or as the manufacturer recommendsCompetent Person (Decontamination) or service engineerEngland: HTM 01-05 paragraph 12.5
Steriliser validation, with the annual thermometric, dryness and steam generator overheat cut-out testsAt installation, annually and after major repairsCompetent Person (Decontamination) or service engineerEngland: HTM 01-05 paragraphs 12.2 and 12.5
Washer-disinfector: strainers and filters cleaned, and every load examinedDailyUser or, by delegation, operatorEngland: HTM 01-05 paragraph 13.3
Washer-disinfector protein residue test and door seal checkWeeklyUser or, by delegation, operatorEngland: HTM 01-05 paragraph 13.3
Washer-disinfector door interlocks, automatic control, cleaning efficacy, chemical dosing and thermometric disinfection testsQuarterly, or as the manufacturer recommends; all validation tests annuallyCompetent Person (Decontamination) or service engineerEngland: HTM 01-05 paragraphs 13.2 and 13.3
Ultrasonic cleaner: strainers and filters cleaned, drained at the end of the day or session, and every load examinedDailyUser or, by delegation, operatorEngland: HTM 01-05 paragraph 14.3
Ultrasonic cleaner door seal check and protein residue testWeeklyUser or, by delegation, operatorEngland: HTM 01-05 paragraph 14.3
Ultrasonic cleaner automatic control, calibration, cleaning efficacy and ultrasonic activity testsQuarterly, or as the manufacturer recommends; all validation tests annuallyCompetent Person (Decontamination) or service engineerEngland: HTM 01-05 paragraphs 3.29 and 14.3
Dental unit waterlines flushedAt least two minutes at the start and end of the day and after a significant period unused, such as lunch; at least 20 to 30 seconds between patientsPractice staffEngland: HTM 01-05 paragraph 6.85
Decontamination auditAt least every six monthsThe practice, with the IPS/DH audit tool strongly recommendedEngland: HTM 01-05 paragraphs 1.7 and 2.21
Spore test (biological indicator) on each steriliserAt least weekly, with mechanical and chemical monitoringPractice staffUnited States: CDC, Sterilization and Disinfection
Dental unit water quality monitoring, to 500 CFU/mL or fewer of heterotrophic water bacteriaRoutinely, as the manufacturer of the unit or waterline treatment product recommendsPractice staffUnited States: CDC, Dental Unit Water Quality

Manufacturers’ schedules come first for cleaning machines. HTM 01-05 paragraph 11.13 says the steriliser validation schedules are part of the essential quality requirements, but for washer-disinfectors and ultrasonic cleaners the manufacturer’s guidance on testing should be sought, with the HTM schedules followed where there are no manufacturer’s instructions.

Edition. NHS England’s page for HTM 01-05 lists the 2013 edition, first published on 26 March 2013, which superseded the 2009 edition. Scotland, Wales and Northern Ireland are not covered by these rows; use your own nation’s guidance.

Why Run Your Infection Control Routine in CheckFlow?

1

The checks fit the practice

The first task records how instruments are cleaned, so the washer-disinfector and ultrasonic tasks appear only where the practice has those machines. The quarterly tests, six-monthly audit and annual validation appear only in the weeks that include them, and notes quote HTM 01-05 for England or CDC for the United States.

2

Every week is signed off

The IPC lead is chosen on the first task. The sign-off is assigned to them, and nothing after the approval step can be completed until they record a decision. A failed test or cycle adds a task to withdraw the machine and reprocess the instruments, and anything still open adds a phase to put it right and check it again.

3

A new checklist every week

Start each week’s checklist on a weekly recurring schedule; the practice manager enters the Monday the week starts on the first task and every due date follows from it. The Reports Grid lists each week’s checklist with its answers, with filters and export, and Analytics shows overdue and late tasks by person and step.

CheckFlow does not replace your infection control policy, the manufacturer’s instructions for each steriliser, washer-disinfector, ultrasonic cleaner, dental unit and instrument, or advice from your infection control adviser and service engineer. It runs the routine around them: who checks what, on which day, with what record, and who signed the week off. CheckFlow’s healthcare checklist software shows how the same approach handles other clinical processes.

A sharps injury or other incident during the week goes through the Healthcare Incident Reporting Process Checklist. Practices in England gather the week’s logs and audits as evidence with the CQC Inspection Readiness Checklist (England).

AI generator

Didn’t find what you need? Describe it.

Describe the process in a sentence and the AI checklist generator drafts the phases and tasks for you.

Frequently Asked Questions

What is HTM 01-05?

Health Technical Memorandum 01-05, Decontamination in primary care dental practices, is the Department of Health guidance on decontaminating reusable instruments in dental practices in England. The current edition, listed on NHS England’s website, is the 2013 edition, which superseded the 2009 edition. It sets essential quality requirements every practice should meet, such as instruments free of visible contamination after cleaning, a validated steam steriliser, controlled storage times and a decontamination audit every six months, and best practice to work towards, such as a validated washer-disinfector and decontamination clearly separate from the treatment area.

What should a dental infection control checklist include?

Start-of-day checks (surgeries, waterlines, PPE, hand hygiene supplies, sharps containers and the steriliser’s daily tests), cleaning between patients, instrument decontamination from transport to storage, end-of-day tasks (waterlines, the steriliser, unwrapped instruments and clinical waste), weekly tests and cleaning, and the periodic work: quarterly equipment tests, training and immunisation records, the decontamination audit and annual validation. Finish with a review of the logs, a sign-off and actions for anything that failed. Your own policy and each manufacturer’s instructions set the detail.

How often should dental unit waterlines be flushed?

In England, HTM 01-05 paragraph 6.85 says for at least two minutes at the beginning and end of the day and after any significant period unused, such as a lunch break, and for at least 20 to 30 seconds between patients. It also asks for waterlines to be drained at least at the end of each working day and disinfected periodically as the manufacturer instructs. The CDC summary pages quoted here give no flushing times. They recommend treated water that meets drinking water standards (500 CFU/mL or fewer of heterotrophic water bacteria) and monitoring as the manufacturer of the unit or treatment product recommends.

What daily tests does a dental steriliser need?

Under HTM 01-05 (paragraph 4.16), an automatic control test on every benchtop steriliser, a steam penetration test (Helix or Bowie-Dick) on vacuum sterilisers, and a record of the temperature and pressure reached, all logged with the date and the operator’s signature before the steriliser is used for instruments. A steriliser that fails is withdrawn from service, and instruments from a failed cycle are not used. Weekly, quarterly and annual tests follow paragraph 12.5. In the United States, CDC recommends a spore test at least weekly, with mechanical and chemical monitoring as well. HTM 01-05’s periodic test schedule has no spore test: it relies on the physical tests in paragraph 12.5, and lists a microbiological test only as an optional type test for the manufacturer (paragraph 12.3). A practice whose own policy adds spore tests can add the task.

How often should a dental practice audit infection control?

HTM 01-05 says practices in England should audit their decontamination processes at least every six months, strongly recommends the Infection Prevention Society/DH audit tool, and asks for audits to be kept for at least two years. In the United States, CDC recommends routine evaluation of the infection prevention programme and offers its Infection Prevention Checklist for Dental Settings for it. This weekly checklist adds the audit in the week it is due; for a full scored audit of one area, use the Infection Control Audit Checklist.

What is the difference between essential quality requirements and best practice?

In HTM 01-05, essential quality requirements are the level every practice should meet: instruments reprocessed through a validated decontamination cycle with a validated steam steriliser, free of visible contamination before sterilisation, stored to prevent recontamination with controlled storage times, a decontamination audit every six months and a plan for moving towards best practice. Best practice adds three things: cleaning in a validated washer-disinfector, decontamination clearly separate from the treatment area, and storage of reprocessed instruments separate from the treatment area. The guidance sets no deadline for reaching best practice, but every practice needs a written plan for it.

How long can sterilised dental instruments be stored?

Under HTM 01-05 paragraph 2.4(k), wrapped instruments up to one year, unwrapped instruments in the clinical area one day at most, and unwrapped instruments in a non-clinical area one week at most, kept dry and protected from contamination. Unwrapped instruments in the clinical area are reprocessed at the end of the day, used or not. In the United States, CDC asks for packages to be labelled with the date of sterilisation and any expiration date, and inspected before use.

Is CheckFlow free for this template?

14-day free trial, no card required. The Business plan is $10 per user per month after the trial. Full details at checkflow.io/pricing.

Run Every Week’s Checks, Then Sign Them Off

Free trial — no credit card required.

14-day free trial, no credit cardFull refund in your first 30 daysUS hosting, EU on request