New Menu Item Launch Checklist Template

Take one new dish from the brief to its 30-day review: recipe and test cooks, costing, allergens and labels, menus and POS, training at every site, a go/no-go, launch and the numbers afterwards.

Last reviewed: November 2026

Printed from checkflow.io/templates/hospitality/new-menu-item-launch-checklist

This free new menu launch checklist is for head chefs, food and beverage managers and restaurant groups in the UK and the US launching a new dish or menu change at one or more sites. One run is one launch, planned back from the day the dish goes on sale: the brief, the concept and recipe, test cooks and a tasting panel, the final recipe card, supplier specifications, costing and price, the allergens and any calorie or nutrition labelling, menus, POS and online listings, and training at every site. The approver makes a go/no-go decision before launch, and the dish is checked in its first week and reviewed after about a month. The first task asks where the sites are, and each task then shows the UK or US rules, including calorie labelling in England and FDA menu labelling for US chains.

One Menu Change, Not the Whole Allergen Set-Up

A new dish touches almost every part of a restaurant: the recipe, the suppliers, the price, the allergen information, the menus and the till, and the people who cook and serve it. Launching it well means doing those in the right order, so that the allergen information and the costing are worked out from the recipe the sites will actually cook.

This checklist covers one menu change from the brief to its 30-day review. The standing allergen controls a site runs all year are the Food Allergen Management Checklist, and opening a whole new restaurant is the New Restaurant Opening Checklist.

This checklist

One new dish, from brief to review

Who runs it: the head chef or food and beverage manager, with purchasing, the allergen lead and front of house.

Covers: recipe and test cooks, costing and suppliers, allergens and calorie labelling, menus, POS and online listings, training, a go/no-go, launch and a 30-day review.

Output: a dish every site cooks the same way, with its records.

All year

The site’s allergen controls

Who runs it: the manager or allergen lead at each site.

Covers: the whole allergen matrix, suppliers, kitchen separation, service and training, reviewed once a year and after changes.

Output: an approved allergen review. Use the Food Allergen Management Checklist.

A new site

Opening a restaurant

Who runs it: the owner or opening manager.

Covers: licences and registration, fit-out, hiring, the opening menu and the soft opening.

Output: a restaurant ready to trade. Use the New Restaurant Opening Checklist.

What the New Menu Item Launch Checklist Covers

Nine phases take one new dish from the brief to its 30-day review. The template allows twelve working weeks before the launch date, which suits a new dish with new suppliers; for a simpler change, enter a nearer date and the same steps fall due sooner, in the same order. The first task asks where the sites are and which labelling rules apply, and each task then shows the UK or US notes: England with 250 or more employees adds calorie labelling, and a US chain covered by FDA menu labelling adds calories and written nutrition information. Food packed before it is ordered, online orders, a new supplier and a dish coming off each add the tasks they need. The approver’s go/no-go halts the checklist, and No-go hides the launch and shows the task to hold it.

  1. Phase 1

    Phase 1: Set Up the Launch

    4 tasks

    Owned by the launch lead. Enter the launch date, the day the dish goes on sale: every due date counts from it in working days, and this template allows twelve working weeks before it. Say where the sites are and which labelling rules apply; each task then shows that country’s notes.

    • Record the launch, the launch date and the people — what is launching and at which sites, the launch date, where the sites are and which menu labelling rules apply, and the six people this checklist assigns
    • Write the brief for the dish — the gap on the menu it fills, the guests it is for, the target price and food cost per portion, how long it will stay on the menu, and how it will be sold
    • Check where it fits on the current menu — the menu section and price point it sits in, the dishes it competes with, and the dish it replaces, if any
    • Agree the launch plan with the site managers — the launch date, any site that launches later, delivery days, training slots and marketing dates, so every site can plan its rotas and orders around them
  2. Phase 2

    Phase 2: Concept & Recipe

    5 tasks

    The development chef turns the brief into a recipe that every site can cook the same way. List every product by name now: the allergen information and the costing in later phases depend on it.

    • Develop the concept and the first recipe — the idea, the main ingredients, the method and the plating, built to the brief’s price and to what the sites’ kitchens can make
    • List every ingredient, sub-recipe and product — each ingredient with the exact product, brand and supplier, including sauces, garnishes, cooking oil and anything bought in ready-made
    • Check the dish works in every site’s kitchen — the equipment, the station that cooks it, prep time, storage space and how it holds up at the busiest service
    • Check the food safety steps for the new dish — cooking, cooling, reheating and holding temperatures, any process or high-risk ingredient the sites have not used before, and what changes in the food safety management system
    • Write the draft standard recipe card — weights for every ingredient, the method, the yield, the portion size, cooking temperatures and times, and the plating
  3. Phase 3

    Phase 3: Test Cooks & Tasting

    6 tasks

    Cook the dish exactly as the card says, as often as it takes. Before the trial version is served to any guest, the allergen lead checks its allergens and gives them to the trial site. The final recipe card signed off at the end of this phase is the one the costing, the allergen information and the training work from.

    • Cook the dish to the recipe card and record the results — the yield, the portion weight, prep and cooking times, and anything the card got wrong
    • Hold a tasting panel — taste, look, portion size and value scored by the chefs, front of house and managers who will cook and sell it
    • Adjust the recipe and test it again — change one thing at a time, cook again and update the recipe card until the panel is happy with it
    • Check the trial version’s allergens and brief the trial site — the allergens in the version going into the real service, checked against the product labels and specifications, and given to the trial site’s staff so they can answer guests, before any guest is served it
    • Test it in a real service at one site — once the trial site has the allergen information, cook it at a busy service, time the tickets at the pass, and check the station keeps up with the rest of the menu
    • Sign off the final recipe card and plating photo — the version every site will cook from, with a photo of the dish as it should look at the pass
  4. Phase 4

    Phase 4: Costing, Price & Suppliers

    6 tasks

    Cost the final recipe at today’s prices and make sure every product can be bought, specified and delivered in time for training and launch.

    • Get the supplier specification for every ingredient — the specification or product information for each product, with its ingredients, allergens, pack size, shelf life and storage, kept where the allergen lead can read it
    • Approve the new supplier before the first order — the checks your supplier approval procedure asks for, such as food safety certificates, delivery days, minimum order and who to call when a product changes
    • Cost the recipe per portion — every ingredient at current supplier prices, including garnish, sauces, cooking oil and the trim and waste the test cooks showed
    • Set the menu price and check the margin — the price at each site or price band, and the food cost against the brief’s target
    • Plan the run-down of the dish coming off — stock of products only the outgoing dish uses, last order dates, and the day it comes off menus, the POS and the allergen information, which this template sets as the launch date
    • Set up the new products and order launch stock — product codes in your ordering and stock system, par levels for each site, and the first deliveries timed for the training and the launch
  5. Phase 5

    Phase 5: Allergens, Nutrition & Labels

    9 tasks

    Work from the final recipe card and the specifications, never from memory. The labelling tasks shown depend on where the sites are and how the dish is sold.

    • Identify the allergens in every ingredient — from the labels and specifications of the products on the final recipe card, for each component and sub-recipe, with any precautionary “may contain” statement noted
    • Update the allergen matrix and have it checked — the new dish added, any dish coming off removed, and a second person checking every line against the specifications before the matrix is used
    • Update the allergen information customers see — menu notes, the allergen folder or chart, and the notice telling customers how to ask, all matching the new matrix
    • Label food packed on site before it is ordered — a label on every pack made on the premises before it is ordered or selected, checked against the final recipe card and the matrix
    • Work out the calories and add them to menus in England — the energy in kcal for a portion, or for the whole item when it serves more than one, with the portion size, next to the description or price, and the 2000 kcal statement on every menu page
    • Add calories to US menus and menu boards — the calories for each standard menu item next to its name or price, on every menu and menu board including online menus, with the two statements 21 CFR 101.11 requires
    • Prepare the written nutrition information and its records — the written nutrition information kept on the premises for guests who ask, and the records that show how the values were worked out
    • Check every claim in the dish’s description — words such as vegan, vegetarian, gluten-free, free from or local, checked against the recipe, the specifications and how the dish is cooked and served
    • Sign off the allergen and nutrition information for the launch — the matrix, the menu wording, any labels and any calorie or nutrition figures checked once more against the final recipe card before training starts
  6. Phase 6

    Phase 6: Menus, POS & Online Ordering

    5 tasks

    Get everything guests see and staff use ready, but keep it switched off until launch day. The online tasks appear only when the dish will be sold online, by phone or through delivery apps.

    • Update printed and digital menus and menu boards — the dish name and description, the price, and the allergen or calorie information the rules ask for, proofread against the recipe card and the matrix
    • Set up the dish on the POS — the button, price, options, kitchen printer or screen routing and any allergen prompts, tested with a dummy order and kept off sale until launch
    • Prepare the online ordering and delivery app listings — the name, description, photo, price and options on your own website and each delivery app, set to go live on launch day
    • Check allergen information for online and phone orders — the allergen information a guest can see before ordering online or by phone, and what comes with the food on delivery or collection
    • Brief the marketing for the launch — photos, descriptions and dates for social media, email and the sites, using only the claims the allergen lead has checked
  7. Phase 7

    Phase 7: Training & Go/No-Go

    8 tasks

    Every site cooks and sells the dish to standard before anyone decides to launch. The approver’s go/no-go halts the checklist: nothing after it can be completed until the approver completes it.

    • Train the kitchen team at every site — cooking to the recipe card and plating photo, prep and storage, how allergen orders for the dish are made, and who to ask
    • Train front of house to sell and serve the dish — how to describe it, its allergens and how to answer questions, what to suggest with it, and how an allergen order reaches the kitchen
    • Update prep lists, labels and food safety records at each site — prep and par sheets, date labels and the temperature checks for the new dish in each site’s food safety records
    • Check launch stock has arrived at every site — each new product delivered, checked and stored, with enough for launch week
    • Have every site cook the dish to standard — a final cook at each site, checked against the recipe card and plating photo by the development chef or the launch lead
    • Decide go or no-go for the launch — the test cooks and tasting, the costing, the signed-off allergen and nutrition information, the menus, POS and training, and every site’s final cook, taken together
    • Meet the approver’s conditions before launch — each condition the approver set, done and recorded before the dish goes on sale
    • Hold the launch and decide what happens next — tell the sites, keep the dish off the POS, menus and online listings, and record whether it will be fixed and rescheduled or dropped
  8. Phase 8

    Phase 8: Launch

    5 tasks

    Applies only when the launch goes ahead: a No-go on the go/no-go hides this phase. Launch day and the first week. Watch the dish in real services, fix what they show, and put any change to an ingredient through the allergen information before it reaches a guest.

    • Put the dish live at every site — the POS item switched on, menus and boards out, online listings live, and any dish it replaces taken off everything at the same time
    • Check the first services — plating against the photo, ticket times, portion sizes, waste and how allergen orders were handled, site by site
    • Collect guest and team feedback from launch week — what guests said and left on the plate, and what the kitchen and front of house found hard
    • Fix what launch week showed — changes to the recipe card, training or stock, with any change to an ingredient checked against the allergen matrix before it is served
    • Check sales against stock and adjust orders — how many portions each site sold, what was wasted, and the par levels and orders for the weeks ahead
  9. Phase 9

    Phase 9: 30-Day Review

    3 tasks

    Applies only when the launch goes ahead: a No-go hides this phase. About a month after launch, check the dish against its brief and decide its future.

    • Review the dish after 30 days — sales, the actual food cost against the costing, waste, guest feedback and how the kitchen copes, site by site
    • Decide whether to keep, change or remove it — the decision, the reasons and what happens next, with any recipe change going back through the allergen and calorie information
    • File the final records — the recipe card, specifications, costing, allergen matrix version, any calorie or nutrition workings, training records and this review, where the next menu change can find them

UK and US Menu Labelling Rules for a New Dish

Labelling a new dish: the rules by country

The first task asks where the sites are and which labelling rules apply, and each task shows that country’s notes. The steps are the same; who must label what, and how, differs.

Rule United Kingdom United States
Who sets the guidanceThe Food Standards Agency for England, Wales and Northern Ireland; Food Standards Scotland in Scotland. Local authorities enforce.The FDA for menu labelling and packaged food labels. State and local health departments enforce the food code they have adopted.
Allergens to declareThe 14 allergens, including celery, lupin, molluscs, mustard and sulphites above ten parts per million.The 9 major food allergens: milk, eggs, fish, crustacean shellfish, tree nuts, peanuts, wheat, soybeans and sesame (sesame since 1 January 2023).
Dishes served or sold looseEngland, Wales and Northern Ireland: allergen information for every item containing any of the 14, in writing or verbally with a written notice telling customers how to ask; the FSA advises written information backed by a conversation. Scotland: available before purchase, on a menu, chalkboard, shelf label or from staff (Food Standards Scotland).The FDA Food Code asks for written notification of major food allergens in unpackaged food (3-602.12(C), added in 2022 and kept in the 2026 edition, the latest), where the state or locality has adopted it.
Food packed on site before it is orderedPrepacked for direct sale (PPDS): since 1 October 2021, a label with the name and a full ingredients list with the 14 allergens emphasised, in all four nations.The FDA says the allergen labelling law extends to food-service establishments that package, label and offer food, not to food wrapped after the customer orders it.
Calories on menusEngland only, from 6 April 2022: businesses with 250 or more employees (franchisees counted with the franchisor) show kcal and portion size, and “adults need around 2000 kcal a day”.Covered establishments: chains of 20 or more locations under the same name with substantially the same menu, or registered with the FDA. Calories next to the name or price, two statements, and written nutrition information on request.
Short-run and test dishesExempt from calorie labelling when on the menu for less than 30 consecutive days and less than 30 days in total in a calendar year.Daily specials, temporary menu items (less than 60 days in a calendar year) and customary market tests (less than 90 consecutive days) are not standard menu items.
How calories are worked outFrom the manufacturer’s analysis, the ingredients or established data; GOV.UK guidance treats plus or minus 20% as an acceptable margin and recommends keeping records.A reasonable basis (databases, cookbooks, laboratory analyses), with the method and data, and signed statements, given to the FDA on request.
Online and phone ordersAllergen information before the purchase is completed and on delivery (FSA). In England, the website or app shows the calories for food from a business covered by the rules.Menus on the internet count as menus for covered establishments, so they show calories too.

Under review in Scotland. Food Standards Scotland consulted from 23 February to 17 May 2026 on strengthening written allergen information for food that is not prepacked (Food Standards Scotland). It is a consultation, not a rule; check for the outcome before relying on verbal information alone.

Where this comes from. Read on 10 November 2026: the Calorie Labelling (Out of Home Sector) (England) Regulations 2021 and the GOV.UK implementation guidance; the FSA’s allergen guidance for food businesses and PPDS guidance (updated 17 July 2026); Food Standards Scotland’s allergen labelling and PPDS guidance; 21 CFR 101.11 (eCFR); the FDA’s food allergies page and summary of changes in the 2022 Food Code and the 2026 Food Code. This table is a starting point, not legal advice.

Why Run Menu Launches in CheckFlow?

1

The right order, every time

The allergen information and the costing are worked out from the signed-off recipe card, not an early version, and nothing reaches a guest before the allergen lead has checked it.

2

No launch without a decision

The go/no-go is assigned to the approver alone, and the checklist halts there: launch day cannot be completed until the approver has decided, after seeing every site’s final cook. No-go hides the launch and shows the task to hold it.

3

One record per dish

The recipe card, specifications, costing, allergen matrix version, calorie or nutrition workings, training by site and the 30-day review sit on the tasks that produced them, with who did each one and when.

CheckFlow does not calculate calories, cost recipes or analyse allergens: those stay with your chefs, your suppliers’ specifications and your nutrition tools. It keeps one launch in one place, with who does what and by when. The Reports Grid lists every launch with its answers, so the next menu change starts from this one.

Keep the whole allergen set-up reviewed with the Food Allergen Management Checklist, the hazard analysis current with the HACCP Food Safety Checklist, and new starters trained with the Restaurant Employee Training Checklist. Franchise groups can check the dish is served to standard with the Franchise Brand Standards Audit Checklist.

AI generator

Didn’t find what you need? Describe it.

Describe the process in a sentence and the AI checklist generator drafts the phases and tasks for you.

Frequently Asked Questions

What should a new menu launch checklist include?

The brief for the dish, the recipe and its test cooks, a tasting, the final recipe card, supplier specifications, the costing and price, the allergen information and any calorie or nutrition labelling, menus, POS and online listings, kitchen and front-of-house training, a go/no-go decision, launch-week checks and a review after about a month. This template puts them in that order, with UK or US notes on the labelling tasks.

How far ahead should you plan a new menu item?

No rule sets a lead time. This template allows twelve working weeks before the launch date, which leaves room for test cooks, new suppliers, allergen checks, menu printing and training at every site. A small change, such as a new garnish from an existing supplier, needs less: enter a nearer launch date and the same steps fall due sooner, in the same order.

How do you cost a new menu item?

Cost the final recipe card, not an early version: every ingredient at current supplier prices, including garnish, sauces and cooking oil, plus the trim and waste the test cooks showed. That gives the food cost per portion. Compare it with the price as a percentage, and with the target in the brief, before the price goes on any menu. This template records both in Phase 4.

Do restaurants in England have to show calories on the menu?

Yes, if the business had 250 or more employees on the first day of its financial year, for food sold in England that is not prepacked and is ready to eat. The Calorie Labelling (Out of Home Sector) (England) Regulations 2021 have applied since 6 April 2022. Menus show kcal and portion size by each dish, and “adults need around 2000 kcal a day”. Franchisees count with their franchisor. Dishes on the menu for less than 30 consecutive days and 30 days in the calendar year are exempt.

Which US restaurants have to show calories on the menu?

Covered establishments under 21 CFR 101.11: restaurants and similar retail food establishments in a chain of 20 or more locations doing business under the same name and offering substantially the same menu items, and any that register with the FDA to be covered. They show calories next to each standard menu item on menus and menu boards, including online menus, and give written nutrition information on request.

Does a limited-time or test dish need calorie labelling?

Often not. In England, food on the menu for less than 30 consecutive days and less than 30 days in total in a calendar year is exempt. Under the US rule, temporary menu items (less than 60 days in a calendar year), daily specials and customary market tests (less than 90 consecutive days) are not standard menu items. Allergen information is still needed in both countries.

When should the allergen information for a new dish be updated?

Before any guest is served it. A trial at one site needs the allergens of the version being trialled, checked against the product labels; the full allergen information is then updated from the final recipe card and the supplier specifications. Any later change to an ingredient or product goes back through the allergen information before it reaches a guest. The FSA’s guidance says allergen ingredient information should be kept up to date, and to consider the impact when recipes change.

How do you train staff on a new menu item?

Train the kitchen to cook it from the recipe card and plating photo, and front of house to describe it, answer allergen questions and pass allergen orders to the kitchen. Then have every site cook it to standard before launch. This template records training by site and holds the launch until the approver has seen every site’s final cook.

Is CheckFlow free for this template?

14-day free trial, no card required. The Business plan is $10 per user per month after the trial. Full details at checkflow.io/pricing.

Launch Every New Dish the Same Way

Free trial — no credit card required.

14-day free trial, no credit cardFull refund in your first 30 daysUS hosting, EU on request